Taiwan Life Insurance Land BOT Drainage Plan

Location : Nangang District, Taipei City

Site Characteristics Urban Development

Project Scale 3,895.18 m²

Geotechnical Features Runoff within the project site is collected through newly constructed drainage channels and conveyed via an inlet pipe into a stormwater retention basin located beneath the raft foundation. The retention basin utilizes a mechanical pumping system and is designed with a total storage capacity of 3,895.18 m³.

接受