Taipei Pop Music Center (TPMC) Drainage Plan

Location : Neihu District, Taipei City

Site Characteristics Pop Music Center Facility

Project Scale 53,954 m²

Geotechnical Features Runoff within the project site is collected through newly constructed drainage channels and conveyed via an inlet pipe into the TA Stormwater Retention Basin. The retention basin adopts a gravity‐drainage system and is designed with a total storage capacity of 3,925 m³.

接受