Green Lake Park Underground Parking Structure Drainage Plan
Location : Xindian District, New Taipei City
Site Characteristics Underground Parking Facility beneath an Urban Park
Project Scale 14,396.21 m²
Geotechnical Features Runoff within the project site is collected through newly constructed drainage channels and conveyed via inlet pipes to two stormwater retention basins:TA – Landscape Retention Basin (gravity discharge)TB – Mat Foundation Retention Basin (mechanical pumping) The combined design storage capacity of the retention facilities is 1,518.84 m³.